Saturday, April 19, 2008

Fawson homes

Finish trim job for Fawson Homes.






The stairway in this house is curved with single twist, double twist and scroll balusters.









We did alder doors and trim on the main floor of the house. All the windows were cased. We
did alder posts in the theater room. The master closet was done in alder. We wrapped beadboard
around the jet tub. We did one paint and one alder mantle.

Trish's Kitchen addition.

Trish's Kitchen addition and remodel.








Here are some before pics. of Trish's kitchen. The design and planning stages of this remodel have been long. Trish wants taller windows and doors, but as you can see from the picture above there is a big beam in the way. So we decided to make this remodel also an addition by bumping out the wall two feet and building nine foot walls instead of eight.



Pool House Remodel

Pool house remodel.

This project involves a lot of remodeling plus we're also doing an addition. We are adding a dormer
on room above the kitchen. We are completely gutting the bathroom. All the floor is being replaced. The trim is being glazed and refinished. The walls are also getting primed and repainted.

Poulsen Home

Finish job for Poulsen Homes