Saturday, August 8, 2009
Sunday, June 7, 2009
Friday, November 21, 2008
Roof Replacement
On this job we stripped the old cedar shakes and re-papered and shingled the entire roof.
We also replaced the soffit, fasia, and rain gutters.
Posted by jaybay at 3:04 PM 0 comments
Saturday, April 19, 2008
Fawson homes
Finish trim job for Fawson Homes.
The stairway in this house is curved with single twist, double twist and scroll balusters.
We did alder doors and trim on the main floor of the house. All the windows were cased. We
did alder posts in the theater room. The master closet was done in alder. We wrapped beadboard
around the jet tub. We did one paint and one alder mantle.
Posted by jaybay at 10:37 PM 0 comments
Trish's Kitchen addition.
Trish's Kitchen addition and remodel.
Here are some before pics. of Trish's kitchen. The design and planning stages of this remodel have been long. Trish wants taller windows and doors, but as you can see from the picture above there is a big beam in the way. So we decided to make this remodel also an addition by bumping out the wall two feet and building nine foot walls instead of eight.
Here are some before pics. of Trish's kitchen. The design and planning stages of this remodel have been long. Trish wants taller windows and doors, but as you can see from the picture above there is a big beam in the way. So we decided to make this remodel also an addition by bumping out the wall two feet and building nine foot walls instead of eight.
Posted by jaybay at 10:36 PM 0 comments
Pool House Remodel
Pool house remodel.
This project involves a lot of remodeling plus we're also doing an addition. We are adding a dormer
on room above the kitchen. We are completely gutting the bathroom. All the floor is being replaced. The trim is being glazed and refinished. The walls are also getting primed and repainted.
Posted by jaybay at 10:35 PM 0 comments
Thursday, February 28, 2008
Hildebrandt remodel
Here are some before pic of hildebrant remodel.
Here is the finished product.
On this remodel we completely gutted the garage. We re-famed the garage added
insulation, drywall, shelving, workbench, and floor epoxy. The outside we replaced
the siding with stucco, changed the soffit, fascia, rain gutter , garage door and front door
to dark brown and changed the ext. lighting.
Posted by Jake Story at 12:01 PM 0 comments